Bathroom remodeling built around proper waterproofing, practical layouts, and lasting finishes.
Proper substrate and membrane detailing before any tile goes down.
Licensed plumbing for relocations, upgrades, and new fixtures.
Shower, floor, and feature tiling installed to spec.
Ventilation to manage moisture, with lighting planned for the space.
Typically three to six weeks on site depending on scope and tiling.
Yes, including accessible and curbless designs.
Because we see the failures. A shower that was not waterproofed correctly becomes a mold and structural job, and that repair costs many times the original tiling.